20 Fullarton Dr Epping VIC 3076
Land Size : 2,057sqm
The project development at 20 Fullarton Drive aims to transform the site into a functional industrial complex consisting of two large factories and four-level car parks. Located in a strategic location, this project offers an opportunity to create a modern and efficient space that meets the needs of industrial businesses. This project description provides an overview of the development plans, highlighting its key features and benefits.
Situated at 20 Fullarton Drive, the project benefits from a convenient location with easy access to major transportation routes and industrial areas. Its proximity to highways, ports, and distribution networks makes it an ideal choice for businesses requiring efficient logistics and operations. The location also offers convenience to employees and visitors, contributing to a thriving industrial ecosystem.
The project at 20 Fullarton Drive aims to create a well-designed industrial complex that prioritizes functionality, flexibility, and convenience. The development will encompass the following key aspects:
The project will include two large factories, offering ample space for industrial operations. The factories will be designed to accommodate a range of manufacturing or production processes and may include features such as high ceilings, loading docks, and flexible floor plans. The layout will allow for efficient workflow and space utilization.
The development will prioritize the installation of robust infrastructure and utilities to support the needs of industrial businesses. This includes well-designed road networks for smooth traffic flow within the complex, adequate parking spaces, loading areas, and proper drainage systems. Access to reliable water, electricity, and internet services will be ensured to facilitate seamless operations.
The project will incorporate four-level car parks to provide convenient parking options for employees, visitors, and clients. These car parks will be strategically located within the complex, ensuring easy access and minimizing congestion. Proper signage, lighting, and security measures will be implemented to enhance safety and efficiency.
The development will prioritize the safety and security of the factories and their occupants. This includes implementing advanced security systems, monitoring mechanisms, and appropriate fire safety measures. The project will comply with relevant safety regulations and guidelines to provide a secure working environment for businesses and their employees.
The design and layout of the factories will allow for flexibility and scalability, enabling businesses to expand and adapt to changing needs. The project will consider future growth and provide provisions for potential expansion, additional storage, or office spaces. This flexibility will provide a supportive environment for business growth and development.
The project will focus on enhancing connectivity and accessibility to support efficient business operations. Adequate transport infrastructure, including road connections, loading areas, and truck access, will facilitate the movement of goods and services. Proximity to major transportation hubs and logistic networks will provide businesses with convenient access to suppliers, customers, and markets.
The project development at 20 Fullarton Drive aims to create a modern and efficient industrial complex that meets the needs of industrial businesses. With a strategic location, thoughtful design, and emphasis on functionality and flexibility, the development seeks to provide a conducive environment for businesses to thrive. By prioritizing infrastructure, security, and connectivity, the project aims to contribute to the success and growth of the industrial sector in the area.